The new build snagging checklist

Last updated: 24 July 2026

A snag is anything in your new home that isn't finished to a reasonable standard. Chipped tiles, doors that catch, paint over dust, gaps in the mastic. None of it is unreasonable to raise, and most of it is a short job for the right trade.

Two things make the difference between a list that gets actioned and one that gets ignored: a photo, and the date you found it. Log both as you go, because you will not remember later.

Is that a snag, or am I being fussy?

If it isn't finished properly, log it. You can always withdraw it later. Common ones:

How to walk the house

  1. Do one room at a time, and finish it before moving on.
  2. Work top to bottom: ceiling, walls, then floor, then fittings.
  3. Open and close everything with a hinge or a runner.
  4. Take a torch. The one on your phone is not enough for a loft or under a sink.
  5. Photograph each snag as you find it, wide shot then close up.
  6. Take someone with you. A second pair of eyes finds roughly a third more.

Room by room

Living rooms, bedrooms and hallways come down to the same list: walls and ceilings for cracks and finish, skirting and architrave for gaps and paint, doors for catching and latching, sockets for level and function, windows for draughts and locks, and floors for squeaks, lifting edges and marks.

How long you have

Most new build warranties make the builder responsible for defects during the first two years, with structural cover after that. Many builders also ask for an initial list within a week or two of you moving in, which is their process rather than the limit of your cover. Read your own warranty documents and your builder's customer care policy, because they differ.

The practical consequence is the same either way: raise things in writing, with dates, as you find them.

Download the printable version (PDF) and take it round the house.

After the walk

A first walk finds more than anyone holds in their head. SnagTrace keeps each snag with its photo, the room it's in and the trade that fixes it, then exports the lot as one dated report you can send. Free for your first 25 snags.

Join the waitlist

This is general guidance for new build homeowners, not professional or legal advice. Warranty cover and builder policies differ, so always check your own documents for what is covered and by when.